Back to home
About UsReferences & ApprovalsStandardisation DataClienteleFeedback
 

Sr. No.

Component / Operation

Characteristics
Checked

Category

Type / Method
Of Check

Extent of Check

Reference
Document

Acceptance
Norm

Format Of Record

Agency

P W   V

Remarks

1

2

3

4

5

6

7

8

9

10

11

1

Raw Material Identification for

1.1

Convolutins,

Flanges, Shrouds, Sleeves, Tie rods, Spherical Washers & Seats, Nuts

1) Mechanical & Chemical Properties, Inter granular corrosion.

2) Surface defects

3) Dimensions

MA

MA

MA

1) Verification Correlation

& Identification of

Material with T. C.

2) Visual examination

3) Measurement

As Per relevant material std.

100%

100%

Material Spcn.

as per appd. Drawings

–do-

Appd. Drawings

As per relevant  material std. In appd. drawings

–do-

Appd. Drawings

T. C. & route card

Inspection Report

-do-

2   1  –

2  2   1

2  2   1

1.2

Weld Ends

Mechanical, Chemical and

Leak tightness

MA

Verificatin Correlation & Identificatin of material with T. C.

100%

-do-

-do-

-do-

2   1   -

2

Welding

2.1

Welding Procedure

Procedure Qualification

Welder Performance

Qualification

Correctness of Proceure

Suitability

Welders Performance

CR

CR

CR

Examinations of WPS Review of PQR Verification/Qualification

100%

100%

100%

ASME Sec. IX

ASME Sec. IX

ASME Sec. IX

QW482 of SAME IX

QW482 of SAME IX

QW482 of SAME IX

-

-

-

3/2  -  1

2.2

Butt / Grove Welds

(Bellows & Flanges)

Fit up soundness of weld

Soundness of weld

MA

CR

Visual & Measurements PT & RT

100%

100%

ASME Sec. IX & Appd. Drg. ASME Sec. V & Appd. Drg.

ASMe Sec VIII & Divn. 1

-do-

Inspection Report

-do-

3/2  2/1 1

3/2  2/1 -

382 2/1  -

3

Fillet Welds

-do-

MA

P. T.

10 %

-do-

-do-

-do-

2   2   1

3

Beelows

Convolutins

1) Workmanship dimension

2) Dimensions

3) Thinning

4) Surface defects

5) Axial Spring Rate

MA

MA

MA

MA

CR

Visual

Measurement

U. T.

P. T.

Stiffness Test

100%

100%

As Reqd.

As Reqd.

100%

-do-

-do-

-do-

-do-

EJMA & Tech. Specification

-do-

Appd. Drawings

Max. 15%

No surface defects

Tech. Specificatin

-do-

-do-

-do-

-do-

Inspection Report

2   1   -

2   1   -

2   1   -

2   1   -

2   1   -

3.1

Flanges, Shroud, Sleeve

Tie Rods, Washers, Nuts

Workmanship and dimns.

Workmanship and dimns.

MA

MA

Visual & Measurement Visual & Measurement

100%

Appd. Drawing

Appd. Drawing

Appd. Drawing

Appd. Drawing

Inspection Report

Inspection Report

2   -   1

2   -   1

3.2

Assembly

Workmanship and dimns.

MA

Visual & Measurement

100%

Appd. Drawing

Appd. Drawing

Inspection Report

2   -   1

4

Completed Unit

1)Delfection

2) Leak Tightness

3) Vacuum Test

4) Dimensions

5)Cleanliness

6) Paint Thickness

7) Workmanship

8) Marking

CR

CR

CR

MA

MA

MA

MA

MA

Deflection

Hydraulic / Pneumatic Test

Vaccum Test

Measurement

Visual

Measurement

Visual

Visual

As Req.

100%

As Req.

100%

100%

As Req.

100%

100%

Appd. Drawing

Tech. Spec.

-Do-

Appd. Drawing

Tech. Spec..

- do -

-

- do -

-do-

No leakage or

Permanent deflectin

Appd. Drawing

Tech. Spec.

-do-

-

-do-

Test Report Inspn.

Inspection Report

Inspection Report

-do-

-do-

-

-do-

2   -   2

2   -   1

2   -   1

2   -   1

2   -   1

-   -   -

2   -   1

5

Documentation

Completeness of records

MA

Verificatin of records and  certificates

100%

Tech. Spec. & Appd. Drawing

Tech. Spec. & Appd. Drawing

Inspectin

Records

T. C.

2   -   1

6

Packing

Soundness of Packing

MA

Visual / Dimension

100%

As Per P. O.

As Per P. O.

Inspection Report

2   -   1